Tue 06 September 2005 |
A bitty day. I started by remaking the #14 bracket and drilling it all up. | 
|
Next I tidied all the bracing rivets. I'm using flush head rivets for all the internal walls wherever possible. Also sorted the #9 strengtheners. | 
|
I also fixed the height for the outer rear LHS baffle. This helped with the alignment of the rear inner LHS baffle. | 
|
The baffle needed some more trimming, the upper section seems to still need to be at an angle which lead me to.... | 
|
Changing the overall angle. I'll need to create a wedge for this at some point. | 
|