Wed 19 October 2005 |
The majority of the day was spent finalising / sorting an order for 'bits' from VANs. Hopefully the system will be able to work and the postage and packing won't be too horrendous. I also included the Air Speed and Altimeter instruments along with a couple of batteries. | |
Finally it was back to the plenum, opened up the rear locations to AN3 bolts. | 
|
The rest of the day was countersinking, dimpling, de-burring etc the various plenum parts. | 
|