Fri 21 April 2006 |
Dad continued with grounding and layout work on the firewall. | 
|
After more thought, we took the plunge on the first large eyeball location. Hopefully this will be for the P2 prop control. | 
|
I continued with the avionics rack, drilling and tapping 3 locations each side. | 
|
Then the mock panel was drilling / recut for the avionics rack - some refinement needed for the upper cut. Also played with using a smaller cut out for the EIS4000 and flush mounting it from behind - I think it might work well. | 
|