Thu 05 October 2006 |
I started with some bits - re-installed the 4 adel clamps in the main tunnel - fiddly but simple. | 
|
Then tied up various cable bundles with lacing cord, I'm using lacing rather than plastic wraps - a little more work, but light and simple. | 
|
With the stick grips now the 'right' size, I sorted the trim / PTT wiring. | 
|
I'm reusing some of the GRT EIS harness that isn't needed. These are pre-terminated and colour coded. | 
|
Dad sorted a stiffener plate for the P1 push/pull cables | 
|
I roughed out the stick installation. The P2 stick needed a little more trimming - the bolts and washers also need re-looking at. | 
|