Fri 23 March 2007 |
Remounted the engine frame - probably last test fit. Various things to check / work out, FADEC harness locations, push / pull cable routings, SCAT tubes etc. |
|
This is the upper left (P1 side) corner, from above - it is tight getting the dual prop controls, throttle controls and FAB alternate air line. In addition the oil cooler / hot air duct and in-line fuel filter are in 'final' locaitons. |
|
This is the best SCAT tube layout that we can come up with so far. |
|
Reinstalled the rest of the plenum and continued playing with the push/pull cables. The throttle bracket looks like it is going to be a problem - the P2 cable seems to be lacking in downward angle - hopefully it won't mean a complete re-fabrication of a new bracket |
|