Tue 05 June 2007 |
Dad continued with some of the mounting of the VS - some sorting of fresh bolt hardware / rationalising stock was also needed. | 
|
I continued with the FAB alternate air door - lots of thinking / positioning and trialing. | 
|
Ready for flox / glass work. | 
|
Quite a bit of planning / shopping list creation took most of the morning - slow but the list is coming together. | |