Home | Research | Delivery | Empennage | Wings | Fuselage | Finish | Engine | Electrical | GRTDecode

Thu 09 March 2006

I spent most of the day fabricating multiple backing stiffeners for the battery boxes and ECU mounts. Generally 032 plus the needed holes and one or more bent lips for rigidity.
Dad revisited the flaps / floor area. With the removable baggage floor we decided to modify it further to enable removal without touching the flap center mount. To provide some spacing and an additional nutplate fixture a small support plate was made.
Once evreything had been match drilled the floor pan could be modified.
Other things today included finalising the Stein electrics order, hopefully we have got something close to what we need, all takes time however. 
Carl Morgan