Tue 14 March 2006

With all the stiffeners painted, the firewall parts were shot/bucked. The ECUs and battery boxes are now mounted - maybe for good.
Then I started other things, the panel top angle was riveted on.
The whole foredeck structure was reinstalled. I'm about ready to rivet this in for good, but caution was taken and Dad wasn't around for bucking.
Then it was internal cockpit stuff, the control columns were put back in and the quadrant assembly.
Carl Morgan