Home | Research | Delivery | Empennage | Wings | Fuselage | Finish | Engine | Electrical | GRTDecode

Thu 09 August 2007

Dad finished the elevator mounting - did up all the lock nuts and torque sealed.
I pottered around various stuff - installed the parking brake control cable - the last item to be installed on the panel.
The B nut on the brake valve and angle bracket mount were a pain to install with the sound proofing.
The current panel status - all coming together nicely.....
Then back to the firewall forward FAB. This is the baffle seal between the cowl and air inlet.
Getting closer but not sitting cleanly in the lip - more sanding / shaping.
Carl Morgan